网址:http://www.biaoshufang.com 时间:2019-01-02

商务标.技术标标书需求留意哪些

Business tenders. What should we pay attention to in technical tenders?
按照招标文件有的放矢
Targeted according to tender documents
获取招标文件后首先要做的应该是经过分析招标文件,判定招标战略。比如说有没有约束条款招致自身无法照应,或许倾向性能否严峻。说白了就是得分析自身中标的概率。
After obtaining the bidding documents, the first thing to do is to analyze the bidding documents and determine the bidding strategy. For example, if there are any restrictive clauses that make it impossible for us to cope with them, maybe the tendency is severe. To put it bluntly is to analyze the probability of winning the bid.
商务标的留意事项:
Notes on Business Objects:
1.报价编制说明要契合招标文件要求,繁简妥当。
1. The quotation preparation instructions should be compliant with the requirements of the bidding documents, simple and appropriate.
2.报价表格式按照招标文件要求格式,留意子目排序能否正确。
2. The form of quotation form shall be in accordance with the format required by the tender documents, and attention shall be paid to the correctness of the sorting of sub-items.
3.“招标报价汇总表算计”.“招标报价汇总表”.“归结报价表”及其他报价表按照招标文件规则填写,编制人.审阅人.招标人按规则签字盖章。
3. "Summary of tender quotation", "Summary of tender quotation", "Summary of tender quotation", "Summary quotation form" and other quotation forms shall be filled out in accordance with the rules of tender documents, and the compiler, reviewer and tenderer shall sign and seal in accordance with the rules.
4.检查“招标报价汇表算计”与“招标报价汇总表”的数字能否契合,能否有算术差错。
4. Check whether the figures of "calculation of tender quotation summary form" and "summary form of tender quotation" match and whether there are arithmetic errors.
5.检查“招标报价汇总表”与“归结报价表”的数字能否契合,能否有算术差错。
5. Check whether the figures of "Summary Table of Bidding Quotations" and "Summary Table of Bidding Quotations" match and whether there are arithmetic errors.
6.检查“归结报价表”的单价与“单项概预算表”的目的能否契合,能否有算术差错。“归结报价表”费用能否完全,特别是来回改动时要特别留意。
6. Check whether the unit price of the "final quotation form" corresponds to the purpose of the "individual budget estimate form" and whether there are arithmetic errors. Whether the cost of the "final quotation form" is complete or not, especially when making changes back and forth, we should pay special attention to it.
7.检查“单项概预算表”与“补偿单价分析表”.“运杂费单价分析表”的数字能否契合,工程数量与招标工程量清单能否共同,能否有算术差错。
7. Check whether the figures of "single budget estimate table" and "compensatory unit price analysis table", "unit price analysis table of freight and miscellaneous expenses" match, whether the bill of quantities of projects and tender works can be common, whether there are arithmetic errors.
8.特别留意“补偿单价分析表”.“运杂费单价分析表”能否有偏高.偏低景象,分析缘由,所用工.料.机单价能否合理.准确,避免发生不均衡报价。
8. Pay special attention to the Compensation Unit Price Analysis Table. Whether the Transportation and Miscellaneous Fees Unit Price Analysis Table is on the high side and on the low side, analyze the reasons, and whether the unit price of labor, material and machine is reasonable and accurate, so as to avoid unbalanced quotation.
专业标书制作公司
9.“运杂费单价分析表”所用运距能否契合招标文件规则,能否契合查询理论。
9. Whether the distance used in the "unit price analysis table for freight and miscellaneous charges" conforms to the rules of bidding documents and the query theory.
10.协作辅佐工程费能否与标段规划概算相挨近,降造崎岖能否称心招标文件要求,能否与招标书其他内容的有关说明共同,招标文件要求的其他报价材料能否准确.完全。
10. Whether the cost of cooperative assistant projects is close to the budget estimate of the standard section planning, whether the rugged construction can satisfy the requirements of the tender documents, whether it can be in accordance with the relevant instructions of other contents of the tender documents, and whether the other quotation materials required by the tender documents are accurate and complete.
11.定额套用能否与施工组织规划组织的施工方法共同,机具配备尽量与施工方案相契合,避免工料机统计表与机具配备表出现较大差别。
11. Whether the quota application can be combined with the construction method of construction organization planning and organization, and the equipment allocation should be in accordance with the construction plan as far as possible, so as to avoid the big difference between the statistical tables of material machines and the equipment allocation tables.
12.定额计量单位.数量与报价项目单位.数量能否相契合。
12. Quota units of measurement. Quantity and quoted project units. Quantity can match.
13.“工程量清单”表中工程项目所含内容与套用定额能否共同。
13. Are the contents of the project in the Bill of Quantities and the applicable quotas common?
14.留意:“招标报价汇总表”.“工程量清单”选用Excel表自动核算,数量乘单价能否等于合价(合价按四舍五入规则取整)。算计项目反求单价,单价保管两位小数。
14. Note: "Summary of Bidding Quotations", "Bill of Quantities" uses Excel table to automatically calculate whether the quantity multiplied by unit price equals the price (the price is rounded according to the rules). Inverse unit price calculation project, unit price preservation of two decimal places.
本文由东营书坊图文制作有限公司http://www.biaoshufang.com整理,我们将为您提供更多专业标书制作公司知识,有兴趣的朋友可以关注我们,谢谢!!
This article is organized by Dongying Bookstore Picture and Text Manufacturing Co., Ltd. http://www.biaoshufang.com. We will provide you with more professional knowledge of Bid Manufacturing Company. Interested friends can pay attention to us. Thank you!!