商务标在制作时应该注意哪些?

网址:http://www.biaoshufang.com 时间:2019-06-21

1、报价编制阐明要契合招标文件请求,繁简得当。

1. The formulation of quotation should meet the requirements of bidding documents and be simple and appropriate.
2、报价表格式依照招标文件请求格式,留意子目排序能否正确。
2. The form of quotation form shall be in accordance with the request form of bidding documents, and attention shall be paid to the correctness of subentry sorting.
3、“招标报价汇总表合计”、“招标报价汇总表”、“综合报价表”及其他报价表依照招标文件规则填写,编制人、审核人、招标人按规则签字盖章。
3. "Summary of Tender Quotation Form", "Summary of Tender Quotation Form", "Comprehensive Quotation Form" and other quotation forms shall be filled in in accordance with the rules of tender documents, and the compiler, auditor and tenderer shall sign and seal the rules.
4、检查“招标报价汇表合计”与“招标报价汇总表”的数字能否吻合,能否有算术错误。
4. Check whether the sum of tender quotation tables and the sum of tender quotation tables tally with each other and whether there are arithmetic errors.
专业标书制作公司
5、检查“招标报价汇总表”与“综合报价表”的数字能否吻合,能否有算术错误。
5. Check whether the figures of the "Summary Table of Bidding Quotations" and the "Comprehensive Quotation Table" coincide with each other and whether there are arithmetic errors.
6、检查“综合报价表”的单价与“单项概预算表”的指标能否吻合,能否有算术错误。“综合报价表”费用能否齐全,特别是来回改动时要特别留意。
6. Check whether the unit price of the Comprehensive Quotation Form is consistent with the index of the Single Budget Estimate Form and whether there are arithmetic errors. Whether the "comprehensive quotation form" fee is complete, especially when making changes back and forth, we should pay special attention to it.
7、检查“单项概预算表”与“补充单价剖析表”、“运杂费单价剖析表”的数字能否吻合,工程数量与招标工程量清单能否分歧,能否有算术错误。
7. Check whether the figures of "single budget estimate table" and "supplementary unit price analysis table" and "unit price analysis table of freight and miscellaneous expenses" coincide with each other, whether the number of projects differs from the bill of quantities of tendered projects, and whether there are arithmetic errors.
8、特别留意“补充单价剖析表”、“运杂费单价剖析表”能否有偏高、偏低现象,剖析缘由,所用工、料、机单价能否合理、精确,以免产生不均衡报价。
8. Pay special attention to whether the "Supplementary Unit Price Analysis Table" and "Transportation and Miscellaneous Fees Unit Price Analysis Table" are on the high side and on the low side. Analyse the reasons and whether the unit prices of labor, materials and machines used are reasonable and accurate, so as to avoid unbalanced quotations.
9、“运杂费单价剖析表”所用运距能否契合招标文件规则,能否契合调查实践。
9. Whether the distance used in the "Unit Price Analysis Form of Freight and Miscellaneous Fees" conforms to the rules of bidding documents and the investigation practice.
10、配合辅助工程费能否与标段设计概算相接近,降造幅度能否满足招标文件请求,能否与招标书其他内容的有关阐明分歧,招标文件请求的其他报价材料能否精确、齐全。
10. Whether the auxiliary engineering fee can be close to the standard section design budget estimate, whether the reduction scope can meet the request of the tender documents, whether it can clarify the differences with other contents of the tender documents, and whether the other quotation materials requested by the tender documents can be accurate and complete.
11、定额套用能否与施工组织设计布置的施工办法分歧,机具配置尽量与施工计划相吻合,防止工料机统计表与机具配置表呈现较大差别。
11. Whether the quota application can be different from the construction method of construction organization design and layout, and the allocation of machine tools should be in accordance with the construction plan as far as possible, so as to prevent the statistical tables of material machines from showing great differences with the allocation tables of machine tools.
12、定额计量单位、数量与报价项目单位、数量能否相契合。
12. Does the quota measurement unit and quantity match the quoted project unit and quantity?
13、“工程量清单”表中工程项目所含内容与套用定额能否分歧。
13. Is there any difference between the content of the project in the "Bill of Quantities" and the applicable quota?
14、留意:“招标报价汇总表”、“工程量清单”采用Excel表自动计算,数量乘单价能否等于合价(合价按四舍五入规则取整)。合计项目反求单价,单价保存两位小数。
14. Note: Excel table is used to automatically calculate the "Summary of Bidding Quotations" and "Bill of Quantities". Whether the quantity multiplied by unit price is equal to the price (the price is rounded according to the rounding rule). Total project reverse unit price, unit price save two decimal.
感谢您的阅读,此文的文章来源:专业标书制作公司更多的内容和问题请点击:http://www.biaoshufang.com我们会继续努力的为您提供服务,感谢您的支持
Thank you for your reading. For more information and questions, please click on: http://www.biaoshufang.com. We will continue to work hard to serve you. Thank you for your support.