制作工程标书报价应该注意什么?

网址:http://www.biaoshufang.com 时间:2019-05-20

1、报价编制说明要契合招标文件恳求,繁简得当。
1. The quotation preparation instructions should be in line with the solicitation of tender documents and be simple and appropriate.
2、报价表格式能否按照招标文件恳求格式,子目排序能否正确。
2. Whether the form of quotation form is in accordance with the solicitation form of bidding documents and whether the subentry sorting is correct.
3、“招标报价汇总表合计”、“招标报价汇总表”、“综合报价表”及其他报价表能否按照招标文件规则填写,编制人、审核人、招标人能否按规则签字盖章。
3. Whether the "Summary Form of Bidding Quotation", "Summary Form of Bidding Quotation", "Comprehensive Quotation Form" and other quotation forms can be filled in according to the rules of bidding documents, and whether the compilers, auditors and bidders can sign and seal in accordance with the rules.
4、“招标报价汇总表合计”与“招标报价汇总表”的数字能否吻合,能否有算术错误。
4. Whether the sum of tender quotation summary tables and tender quotation summary tables tally or not, and whether there are arithmetic errors.
专业标书制作公司
5、“招标报价汇总表”与“综合报价表”的数字能否吻合,能否有算术错误。
5. Whether the figures of the "Summary Table of Bidding Quotations" and the "Comprehensive Quotation Table" coincide or not, and whether there are arithmetic errors.
6、“综合报价表”的单价与“单项概预算表”的指标能否吻合,能否有算术错误。“综合报价表”费用能否齐全,特别是来回改动时要特别留意。
6. Whether the unit price of the "comprehensive quotation form" is in accordance with the index of the "individual budget estimate form", and whether there are arithmetic errors. Whether the "comprehensive quotation form" fee is complete, especially when making changes back and forth, we should pay special attention to it.
7、“单项概预算表”与“补充单价分析表”、“运杂费单价分析表”的数字能否吻合,工程数量与招标工程量清单能否分歧,能否有算术错误。
7. Whether the figures of "single budget estimate table" and "supplementary unit price analysis table" and "unit price analysis table of freight and miscellaneous expenses" coincide, whether the number of projects differs from the bill of quantities of tendered projects, and whether there are arithmetic errors.
8、“补充单价分析表”、“运杂费单价分析表”能否有偏高、偏低现象,分析缘由,所用工、料、机单价能否合理、准确,以免产生不平衡报价。
8. Whether the "Supplementary Unit Price Analysis Table" and "Transportation and Miscellaneous Fees Unit Price Analysis Table" are on the high side and on the low side, and why, whether the unit price of labor, materials and machinery used is reasonable and accurate, so as to avoid unbalanced quotation.
9、“运杂费单价分析表”所用运距能否契合招标文件规则,能否契合调查理论。
9. Whether the distance used in the "unit price analysis table for freight and miscellaneous charges" conforms to the rules of bidding documents and the investigation theory.
10、配合辅助工程费能否与标段设计概算相接近,降造幅度能否满足招标文件恳求,能否与招标书其他内容的有关说明分歧,招标文件恳求的其他报价资料能否准确、齐全。
10. Whether the auxiliary engineering cost can be close to the standard section design budget estimate, whether the reduction scope can meet the request of tender documents, whether it can be different from the explanation of other contents of tender documents, and whether the other quotation information requested by tender documents is accurate and complete.
11、定额套用能否与施工组织设计布置的施工方法分歧,机具配置尽量与施工方案相吻合,避免工料机统计表与机具配置表呈现较大差异。
11. Whether the quota application can be different from the construction method of construction organization design and layout, and the allocation of machine tools should be in accordance with the construction plan as far as possible, so as to avoid the big difference between the statistical tables of material machines and the allocation tables of machine tools.
12、定额计量单位、数量与报价项目单位、数量能否相契合。
12. Does the quota measurement unit and quantity match the quoted project unit and quantity?
13、“工程量清单”表中工程项目所含内容与套用定额能否分歧。
13. Is there any difference between the content of the project in the "Bill of Quantities" and the applicable quota?
14、“招标报价汇总表”、“工程量清单”采用Excel表自动计算,数量乘单价能否等于合价(合价按四舍五入规则取整)。合计项目反求单价,单价保管两位小数。
14. "Summary of tender quotation" and "Bill of quantities" are calculated automatically by Excel table. Whether the quantity multiplied by unit price is equal to the price (the price is rounded according to the rounding rule). Total project reverse unit price, unit price keeps two decimal.